Evaluate the production floor

Put specifications in context
A specification sheet is a starting point. Confirm the intended substrate, quality setting, usable width and shift pattern when discussing capacity. Final output depends on the agreed application and configuration.
Prepare for installation
Review access, available space, electrical requirements, material handling and the next finishing stage with the team. An on-site assessment and representative test help resolve these questions before commissioning.